Find Jobs
Hire Freelancers

CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION -- 2

$30-250 AUD

Closed
Posted over 2 years ago

$30-250 AUD

Paid on delivery
CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION I NEED SOMEONE TO CREATE A PROGRAMME OF CONSTRUCTIONS WORKS AS PER THE PLAN ATTACHED ONLY EXPERIENCED CONSTRUCTION EXPERTS NEED APPLY
Project ID: 31923019

About the project

8 proposals
Remote project
Active 2 yrs ago

Looking to make some money?

Benefits of bidding on Freelancer

Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
8 freelancers are bidding on average $171 AUD for this job
User Avatar
hi there, i am an architect , i have 11 years of experience on house floor plan, foundation plan design with necessary measurement for construction, i have seen your attachment, i am able to do your house floor plan, foundation plan, elevation and 3d exterior design with landscaping very expertly
$50 AUD in 3 days
4.7 (72 reviews)
5.2
5.2
User Avatar
How ARA YOU? I am PMP-PMI-USA Certified, specialist at project management, expert in Scheduling with Primavera to create schedule and cash flow. I am a civil engineer, construction, class 2004, work as a project manager, PMP Certified, experience in Egypt, Emirates, and Saudi Arabia I Submit High-Quality work, On time. Meg me for Details. My management certificates( PMP, RMP, Primavera, FIDIC Contract, P3O). With my best regards, Eng. Elsayed Elgendy, Civil Engineer, PMP
$140 AUD in 4 days
4.9 (30 reviews)
5.0
5.0
User Avatar
Hi Sir, I will prepare primavera schedule and provide you with clear Tasks and timeline. I am Planner with18 years of experience. I have worked on several project. You can see an example of one of those projects in my portfolio. If you award me the project I'd be very happy to discuss this further and get started for you as soon as possible. Thanks Mohsin Raza
$190 AUD in 7 days
0.0 (0 reviews)
0.0
0.0
User Avatar
Highly experienced construction professional with experience in residential buildings in New York City. I can provide you with cost engineering, scheduling, and logistical planning. Please feel free to contact me directly if you need any assistance.
$140 AUD in 4 days
0.0 (0 reviews)
0.0
0.0
User Avatar
Hi, I am a Masters in construction management graduate, working in the construction industry for 2.5 years as an estimator (MELBOURNE). I work on project programmes and cost analysis on a daily basis. I am unable to open the drawings, and hence would like to confirm the price once I go through them. Thank you.
$175 AUD in 5 days
0.0 (0 reviews)
0.0
0.0

About the client

Flag of AUSTRALIA
Brisbane, Australia
5.0
19
Payment method verified
Member since Aug 1, 2021

Client Verification

Thanks! We’ve emailed you a link to claim your free credit.
Something went wrong while sending your email. Please try again.
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Loading preview
Permission granted for Geolocation.
Your login session has expired and you have been logged out. Please log in again.