In an essay format prepare and explain the following
The building being used has 5 levels a:
• Lower underground car park
• Ground floor which is the entry point also has a café
• Level 1 which is 4 offices
• Level 2 which are 4 apartments
• Level 3 which is the plantroom
The building is in Carlton Melbourne VIC
• Methods used to connect main drains to local authority sewers in accordance with relevant building standards
• Disposal of sewerage within the control of the local authority sewer is assessed in accordance with relevant building regulations and standards.
• Sewer reticulation throughout new building project
• The location of Different stack types with reference to the number of fixtures and the building(s).
• Description of Fixture units and connection
• Requirements to control prohibited substances from entering the sewer system.
I expect 2000-3000 words