Tagging devices on floor plans there are ~90 plans each with an average of forty devices per plan(conduits and equipment). Please do not cross leader lines. Have a few of these to doso could be more work incoming if it works well. The tags family and the devices have all required information all that is required is to place the tags and clean up the tag locations. I'd imagine it'd take 8 hours roughly.I I've included a sample sketch for reference. Each conduit should only be tagged once in between boxes even though there may be multiple segments.
Hello.
I am Amil, Msc Mechanical engineer. I have six years experience with preparing engineering (tech docs) drawings.
Also I am certified AutoCAD ( with ad) engineer.
Message me and we will discuss more in chat.
Regards.