Hi,
I am pleased to propose the following fee structure
1. Investigation and determination of root causes for the poor/unacceptable concrete results ($1000)
2. Report Preparation ($750)
3. Design of concrete mix and/or procedures for pouring concrete in vertical components ($1000)
4. Optional Additional Services:
I am currently a licensed professional engineer in Georgia, and will be licensed in Texas in the next 30 days.
Sealing the Final Report with a PE stamp will be at an extra $650 per State.
I hope you find this proposal satisfactory
Regards,
Said