Find Jobs
Hire Freelancers

constrained linear optimization

$10-30 USD

Completed
Posted over 8 years ago

$10-30 USD

Paid on delivery
A small business produces 3 types of cables: A, B, and C. The cost of in-house production is estimated to be $6, $12, and $10 per foot of A, B, and C respectively. The manufacturing process requires machining and finishing. The machining and finishing time needed to produce a foot of each type of cable are presented in the table below. For the coming productionperiod the firm is contractually obligated to produce 60,000 feet of A, 80,000 feet of B, and 90,000 feet of C. As only 800 hours of machine time and 400 hours of finishing time are available, these demands cannot be met by in-house production alone. The firm has the option of procuring these cables from an external supplier in order to meet the demand. The cost prices (from the external supplier) per foot of cable are as follows: $8 for A, $15 for B, and $12 for C. The production manager has to decide how much of each type of cable to produce in-house and how much to purchase from the external supplier in order to meet the demands exactlyand minimize total cost. The data is summarized below: Cable Type A B C Demand (ft) 60,000 80,000 90,000 Production Cost/ft $6 $12 $10 Procurement Cost/ft $8 $15 $12 Machine time needed (mins/ft) 0.50 0.50 0.60 Finishing time needed (mins/ft) 0.60 0.20 0.40 1. Formulate the problem as a Linear Program: Decision Variables: Objective Function: Constraints:   2. Solve the LP and report your optimal solutions: Minimum cost attainable = $ ___________________ Decision variable values under optimal solutions: Cable Type A B C Produce (ft) Procure (ft) Resources used: Machine time (minutes) Finishing time (minutes) 3. Sensitivity analysis: Explain in each of the following cases whether you expect the costs to increase, decrease, or remain unchanged when the following parameters are changed (one at a time). Assume that all other parameters remain at their original values. Please be as brief and precise as possible in your explanations. (i) The production cost for a foot of cable A increases to from $6 to $7. Cost will: increase, decrease, remain unchanged. Reasoning: (ii) The purchase cost for a foot of cable B increases from $15 to $16. Cost will: increase, decrease, remain unchanged. Reasoning: 4. Memorandum based on sensitivity analysis: Given that the current production capacity is insufficient to meet the demand through in-house production alone, the Chief Operations Officer (COO) wants to know whether the firm should consider increasing the availability of finishing time. Write a short (one paragraph) memorandum to the COO with your [login to view URL] memorandum should also specify at most how much the firm should be willing to pay per hour to increase the availability of finishing time (beyond the current availability of 400 hours).
Project ID: 8465352

About the project

4 proposals
Remote project
Active 9 yrs ago

Looking to make some money?

Benefits of bidding on Freelancer

Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
Awarded to:
User Avatar
Hello there, I am an engineer with experience in optimisation, linear programming. I believe I am a good fit for the job. Looking forward to hearing from you. Regards
$30 USD in 1 day
4.7 (31 reviews)
5.1
5.1
4 freelancers are bidding on average $46 USD for this job
User Avatar
Hello I am Algorithm expert and interested in this project. I have gone through the details and confident to handle this project perfectly. I also have a lot of experience in helping students with assignments. Please communicate to discuss further. Regards Anshu
$30 USD in 1 day
4.7 (113 reviews)
6.1
6.1
User Avatar
Hi there, i have read the question and i can finish the task within an hour...Please contact for info to proceed further... Thanks
$30 USD in 0 day
4.5 (36 reviews)
5.5
5.5
User Avatar
A proposal has not yet been provided
$94 USD in 2 days
4.9 (8 reviews)
4.7
4.7

About the client

Flag of UNITED STATES
United States
5.0
1
Member since Sep 14, 2015

Client Verification

Thanks! We’ve emailed you a link to claim your free credit.
Something went wrong while sending your email. Please try again.
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Loading preview
Permission granted for Geolocation.
Your login session has expired and you have been logged out. Please log in again.